located above the analog cable wire duct. All equipment must be properly grounded to the facility's main ground. Power Supply
The installation of "Panel" can vary widely depending on the specific tool. Generally:
| Parameter | Setting example | |-----------|------------------| | IP address | 192.168.1.100 (same subnet as PLC) | | Device name | GEA_Separator_01 | | Baud rate (if RS485) | 115200 | | Machine type | Select from list (e.g., GEA Westfalia MSC 30) |
located above the analog cable wire duct. All equipment must be properly grounded to the facility's main ground. Power Supply
The installation of "Panel" can vary widely depending on the specific tool. Generally: gea+gforce+panel+manual+install
| Parameter | Setting example | |-----------|------------------| | IP address | 192.168.1.100 (same subnet as PLC) | | Device name | GEA_Separator_01 | | Baud rate (if RS485) | 115200 | | Machine type | Select from list (e.g., GEA Westfalia MSC 30) | located above the analog cable wire duct